CIL Examination - timeline
Draft Charging Schedule Consultation
The Council consulted on a Preliminary Draft Charging Schedule (PDCS) between October and December 2014. The comments received and additional viability work carried out have informed the preparation of a Draft Charging Schedule (DCS).
The DCS sets out the proposed charging rates for Tamworth. The Council considers that these rates strike an appropriate balance between contributing to funding infrastructure and not putting development viability in Tamworth at risk. The DCS is also accompanied by the policies that the Council propose to adopt if CIL is approved.
In accordance with Regulation 16 the Draft Charging Schedule was subject to public consultation for 6 weeks between Friday 23rd October to Friday 4th December 2015.
18 representations were duly received during this consultation period which have been forwarded to the planning inspector for review as part of the CIL examination.
Details of the consultation including a summary of the representations are available in the Regulation 19 Statement of Consultation.
Modifications have been made by the Council to the Draft Charging Schedule as a result of this consultation and these are detailed in the Regulation 19 (d) Statement of Modifications along with a minor amendment to the Charging Zone Map in Appendix A to include National Grid Lines and reference numbers.
Draft Charging Schedule Consultation
The Council consulted on a Preliminary Draft Charging Schedule (PDCS) between October and December 2014. The comments received and additional viability work carried out informed the preparation of a Draft Charging Schedule (DCS).
The DCS set out the proposed charging rates for Tamworth. The Council considered that these rates achieved an appropriate balance between contributing to funding infrastructure and not putting development viability in Tamworth at risk. The DCS was also accompanied by the policies that the Council proposed to adopt if CIL was approved.
In accordance with Regulation 16 the Draft Charging Schedule was subject to public consultation for 6 weeks between Friday 23rd October to Friday 4th December 2015. 18 representations were duly received during this consultation period which were forwarded to the planning inspector for review as part of the CIL examination.
Details of the consultation including a summary of the representations are available in the Regulation 19 Statement of Consultation.
Modifications were made by the Council to the Draft Charging Schedule as a result of the DCS consultation and these are detailed in the Regulation 19 (d) Statement of Modifications along with a minor amendment to the Charging Zone Map in Appendix A to include National Grid Lines and reference numbers.
Examination
In accordance with Regulation 19 of the CIL Regulations 2010 (as amended) Tamworth Borough Council submitted the Draft CIL Charging Schedule for independent examination together with supporting evidence on 25 August 2017.
All the documents submitted to the examiner including CIL evidence, background documents, regulatory statements and copies of representations received are available to view below;
- CIL_06 Tamworth Draft Charging Schedule including Reg 123 list
- CIL_03 Regulation 19 Statement of Consultation
- CIL_04 Statement of Compliance
- CIL_05 Regulation 19 (d) Statement of Modifications
- CIL_07 Whole Plan Viability, Affordable Housing and CIL Study 2014
- CIL_08 Whole Plan Viability, Affordable Housing & CIL Addendum, 2015
- CIL_09 Tamworth PDCS Responses – PBA review and technical note 26th May 2016
- CIL_10 Tamworth CIL Update Report, PBA, 2017
- CIL_11 Tamworth Section 106 Statement
- CIL_12 Adopted Local Plan including Appendix B Infrastructure Delivery Plan
- CIL_13 Adopted Policies Map
- CIL_14 Adopted Policies Map: town centre inset
Representations from CIL Draft Charging Schedule consultation
- CIL_A Barton Wilmore on behalf of Taylor Wimpey
- CIL_B Bilfinger GVA on behalf of B & S Aucott
- CIL_C Birmingham City Council
- CIL_D Colin Smith
- CIL_E Distinctive Property Development
- CIL_F Equality and Human Rights Commission
- CIL_G Highways England
- CIL_H Historic England
- CIL_I Indigo Planning of behalf of Trustees of J.B Aucott
- CIL_J Inland Waterways Association
- CIL_K Lichfield District Council
- CIL_L Natural England
- CIL_M Network Rail
- CIL_N Sport England
- CIL_O Staffordshire County Council
- CIL_P Tetlow King on behalf of Rentplus
- CIL_Q Tetlow King on behalf of West Midlands HARP Planning Consortium
- CIL_R The Planning Bureau on behalf of McCarthy and Stone Retirement Lifestyles Ltd
All those who requested to be notified and those who submitted a response to the Draft CIL Charging Schedule were notified of the submission of Tamworth Borough Councils Draft Charging Schedule and were kept fully informed of the progress of the examination.
Examination Hearing
The examination hearing took place on Wednesday 1st November 2017 and lasted one day. All those who requested to be notified and who submitted a representation were informed of the hearing details, which took place at the Tamworth Council offices at Marmion House.
Documents added during the examination
- CIL_EX_01 Tamworth CIL MIQs
- CIL_EX_02 Tamworth CIL Guidance Note September 2017
- CIL_EX_03 Tamworth CIL MIQs Tamworth BC Response
- CIL_EX_04 Appendix A to TBC response to Examiner's MIQ's - CIL EX 04 01 11 17 update
- CIL_EX_05 TamworthCIL Hearing Agenda
- CIL_EX_06 TamworthCIL TBC Opening Statement
- Tamworth CIL Error Note
Representations received on the Statement of Modifications
Post-hearing modifications consultation
Following the public hearing on 1st November 2017 Tamworth Borough Council has made some proposed modifications to the draft charging schedule. These proposed modifications consist of a number of suggestions to the draft charging schedule made during the hearing and subsequent modifications made by the Council.
The proposed modifications detailed in document CIL_EX_07 and associated maps were subject to a 4 week consultation period from Wednesday 22nd November to 5pm Wednesday 20th December 2017.
The documents are as follows:
- CIL_06 Tamworth Draft Charging Schedule
- CIL_EX_07 Tamworth CIL Statement of Modifications – post hearing
- CIL_EX_08 APP_A1_Residential Charging Zones Map
- CIL_EX_09 APP_A2_Retail Charging Zones Map
- CIL_EX_10 APP_A3_Town Centre Plan
- CIL_EX_11 APP_A4_Local Centre Plans
- CIL_EX_12 APP_A5_Neighbourhood Centre Plans
- Clean Version of the Tamworth Draft charging schedule. For information only
Consultation on the Tamworth CIL Charging Schedule Post-Hearing Modifications ended at 5pm on 20th December 2017. Representations made during the consultation period were forwarded to the inspector for her consideration. Copies of the representations are below:
- CIL_EX_13 Distinctive Property Development
- CIL_EX_14 Network Rail
- CIL_EX_15 and CIL_EX_15a Hunter Page on Behalf of Hinton Group
- CIL_EX_16 CIL modifications consultation responses - TBC comments
On 13 February 2018 the council received the Final Report on the Examination of the Tamworth Borough Council CIL Draft Charging Schedule. The examiner’s report concluded that, “…subject to the modifications set out in Appendix A, the Tamworth Borough Council Community Infrastructure Levy Draft Charging Schedule provides an appropriate basis for the collection of the levy in that area.”
The Council will take the charging schedule (along with associated documents) to Full Council on 17th July 2018 for adoption. It is anticipated that charging will commence on 1st August 2018.